Brisbane Hybrid PV/BESS Power Plant
Hybrid PPC with accurate simulation models in PSCAD and PSSE, supporting GPS compliance studies across five operating scenarios combining solar and battery storage.
Hybrid
PPC + Models
5 Scenarios
Projects
Hybrid PPC with accurate simulation models in PSCAD and PSSE, supporting GPS compliance studies across five operating scenarios combining solar and battery storage.
Hybrid
PPC + Models
5 Scenarios
Integrated Master PPC and SCADA system delivering high reliability and operational flexibility for the entire solar power plant.
39 MW
Master PPC
Full SCADA
R1 compliance study and dynamic model acceptance testing for a large-scale BESS connected at 220 kV, meeting all generator performance standards requirements.
200 MWh
220 kV
R1 Compliant
R0 simulation studies and grid impact assessment covering frequency response, voltage control and fault ride-through for generator performance standards compliance.
80 MW
R0 Studies
PSCAD + PSSE
Master Power Plant Controller and SCADA for the largest wind power plant in ASEAN, featuring 133 turbines with centralised grid compliance and dispatch control.
600MW
133
Master
BoP SCADA, EMS, Microgrid Controller and Master PPC integration for a hybrid solar PV and battery energy storage system, enabling seamless grid-connected and islanding operation.
33MWp
7MW
BoP
Operations Control Centre providing centralised monitoring and control across multiple high-voltage substations, with integrated SCADA dashboards and real-time asset management.
Multi-site
HV
Real-time
Intelligent Microgrid Controller integrating PV, BESS, diesel generators and grid connection with seamless on-grid, off-grid and black-start transition capabilities for C&I applications.
PV+BESS
On/Off
Black
Comprehensive off-grid power solution combining 45.3MW diesel gensets with solar PV and BESS, providing stable baseload power with renewable energy integration for remote industrial operations.
45.3MW
Solar
Off-Grid
SCADA, Energy Management System and Power Plant Controller for a commercial hybrid PV and BESS installation, optimising energy dispatch and grid interaction for maximum ROI.
SCADA
Hybrid
C&I
Three adjoining plants sharing one connection point, with plant control, SCADA and the grid interface delivered as a single system. Export limits and setpoints are coordinated across all three so the connection point behaves as one generator.
550 MWp
660 ha
3
Station and bay level automation, protection and SCADA for the substation and the 220 kV connecting lines, tested end to end and taken through to energisation with the network operator.
500 kV
220 kV
Energised
Factory acceptance testing of the operation control centre that runs the company’s high voltage substations remotely. Switching sequences, alarm handling and operator permissions were witnessed and signed off before the system went to site.
OCC
Jan 2023
One room